What’s the point of HS2?
Christian Wolmar, 17 April 2014
“... proposal for a new line from London to Birmingham’. The line was to operate at 400 kph – which means few curves and low gradients – and had to emphasise connections to Heathrow. Given these constraints, the only viable route was via Old Oak Common, six miles west of Euston, where the line could connect with Crossrail, the east-west route through London ... ”